Full UPSEN product catalogue — 35 pages, all models & specsDownload Catalogue (PDF)
Home / Products / Model

UTD65S Tracked Mobile Stacker Conveyor for Crushing Plant

Product Description

The UTD65S is a tracked mobile conveyor (stacker) that carries crushed or screened material from the plant discharge point into clean stockpiles.

It handles up to 600 t/h on a 83 kW diesel drive and repositions under its own tracks as the pile grows - no foundations and no loader shuttle runs.

One conveyor behind a crusher or screener frees the wheel loader for feeding duties, cutting total plant operating cost. Remote-controlled operation, tracked mobility and a 12-month warranty are standard on every UPSEN machine, with EU conformity documentation and OEM spare parts support for customers in 80+ countries.

Product

Key Specifications

Capacity
600 t/h
Engine
83 kW
Total Weight
22,500 kg
Feed Hopper4800×2300 mm(189×90.6 in)
Feeding ConveyorB1200×3500 mm(B47.2×137.8 in)
Belt Width1200 mm(47.2 in)
Conveying Length20,000 mm(0.8 in)
Conveying Height9,800 mm(0.4 in)
Track TypeSteel Track
Transport Size13500×2750×3120 mm(531.5×108.3×122.8 in)
Working Size19500×2750×8500 mm(767.7×108.3×334.6 in)

Product Videos

Detail Images

Interested in This Machine?

Contact us for a detailed quotation and specifications sheet.

Send Inquiry

Get A Quote

Tell us your project · We respond within 24 hours

We respect your privacy. Your information will never be shared.

UTD65S at a glance

The UPSEN UTD65S is a tracked mobile stacker conveyor built for continuous duty in quarrying, concrete recycling and demolition work. Its rated output is 600 t/h, fed from a 4800×2300 mm hopper and taking material up to — at the inlet.

The unit travels as one load on a low-bed trailer — 13500×2750×3120 mm and 22,500 kg — and is driven by 83 kW, so no site power supply is needed. Steel tracks let the operator reposition the plant as the working face advances.

When specifying a tracked mobile stacker conveyor, always match the throughput of the crusher with the downstream screening and stockpiling equipment, and check the maximum feed size against the material you actually run. An oversized inlet wastes fuel; an undersized one causes bridging and blocked jaws.

Typical applications

How the UTD65S compares

ModelCapacityMax. feed sizeTotal weight
UTD65S (this model)600 t/h— /td>22,500 kg
UTD3530-100 t/h— /td>4,600 kg
UTD40S150-300 t/h— /td>12,000 kg
UTD65150-400 t/h— /td>11,000 kg

Recommended line-up for the UTD65S

Based on rated capacity, the following UPSEN units are usually specified together with the UTD65S:

Frequently asked questions

What is the capacity of the UTD65S?

Rated capacity is 600 t/h. Actual output depends on the material, the feed size and the discharge setting.

What is the maximum feed size?

The UTD65S accepts material up to —

How big and how heavy is the UTD65S?

22,500 kg, transport size 13500×2750×3120 mm. It can be moved on a standard low-bed trailer without dismantling.

What drives the machine?

83 kW.

Does the UTD65S come with EU conformity documentation, and how is it delivered?

Yes — UPSEN machines are supplied with EU conformity documentation and leave the factory ready for work. Delivery is by sea (container or flat rack) to major ports.

What are the payment, lead time and warranty terms?

Payment is 30% T/T deposit with the balance paid before shipment; an irrevocable L/C at sight is also accepted. Quotations are FOB Qingdao and valid for 30 days. Lead time is 15 days for standard models and 30 days for customised configurations, counted from receipt of deposit. The complete machine carries a 12-month warranty from commissioning, and wear parts such as jaw plates carry 6 months with a typical service life of 800-1,200 hours depending on the feed material. Full terms are on our trade terms and service.

Is the TD65S named in the EU conformity documents?

Yes. The TD65S is named in the ECM Mark certificate 0P250820.HFIQW55, the ICR Polska noise verification ICR/VC/UA260915 and the EN ISO 3744:2010 noise test report LTR20260909001. You can download the original documents from our certifications and compliance page.

Do you send an engineer for installation and operator training?

Yes. On-site installation, commissioning and operator training are available. Travel and accommodation are charged at cost and there is no separate service fee. Tell us the site location and we will estimate the number of days.

Related tracked mobile stacker conveyor

UTD35 ConveyorUTD3530-100 t/hView details → UTD40S ConveyorUTD40S150-300 t/hView details → UTD65 ConveyorUTD65150-400 t/hView details →

Complete your crushing line

A single tracked unit rarely does everything — pair the UTD65S with the equipment below to build a working line.

Quality & compliance: ISO 9001:2015 quality management · EU conformity documentation verified by three independent bodies · EN ISO 3744:2010 noise tested, LWA 91 dB(A)

Certificates & declarationsTrade terms & service

WhatsApp Get A Quote